have a question?


Projects

Manufacture and industry


 
BTEX removal from GroundwaterBTEX removal from Groundwater
Low cost long term treatment to remove BTEX from contaminated groundwater using constructed wetlands
File Format: application/pdfFile Size: 1,013KB
Copper RemovalCopper Removal
Using reed bed technology to remove metals from effluents
File Format: application/pdfFile Size: 1,335KB
Boron, Arsenic and Selenium removal from GroundwaterBoron, Arsenic and Selenium removal from Groundwater
File Format: application/pdfFile Size: 1,614KB


breaking news!
Retrofitting Forced Bed Aeration into existing reed beds
Forced bed aeration in reed bed system saves money and educates visitors The National Botanic Garde...
read more?
ARM exhibit at Sustainability Live
ARM are exhibiting at Sustainability Live  on the 24-26 May 2011 in halls 3 and 3a at the NEC, ...
read more?
Wastewater Treatment Upgrade at the Garden of Wales
The National Botanic Garden of Wales has enhanced its green credentials with an updated wastewate...
read more?
 
ARM Ltd. Rydal House, Colton Rd, Rugeley, Staffordshire, WS15 3HF
t: +44 (0) 1889 583811
info@armreedbeds.co.uk

 
(c) 2009 ARM Reed Beds | Terms of Use | Privacy Policy